Home/Infrastructure/Data Centre Design & Build
Facilities
Design, build and commissioning of server rooms and data centres — power, cooling, cabling, containment and monitoring.
What it does
Most server rooms in Tanzania are a converted office with a split unit and an extension lead. They run until the cooling fails on a Saturday, or until nobody can trace which cable feeds the core switch. A data centre is not a room with servers in it — it is power, cooling, cabling and monitoring designed together, so a single failure does not take the business with it.
Tanzania
How we work
Not a sales meeting. We sit with the people who do the work now and find where the time and money actually go.
What will be built, what it costs, how long it takes, and what is explicitly out of scope. In writing, before anything starts.
The part that hurts most is delivered first and put into real use, so value arrives before the whole project is finished.
Your staff are trained on the real system with real data, and support continues after go-live.
Frequently asked
It follows from measured load and the runtime you need — usually enough to ride out short outages and to cover the generator changeover gap cleanly. We measure your actual draw rather than adding up nameplate ratings, which always overstates.
Yes, and this is most of what we do. A typical remediation is proper racking, re-cabling with labelling and testing, cooling redundancy, and environmental monitoring so you learn about a problem before the servers do.
We design to the resilience the business actually needs and state it honestly. Genuine Tier III requires concurrent maintainability throughout — dual power paths, redundant cooling — and that is a budget decision, not a label we will apply loosely.
Yes, detection and clean-agent suppression appropriate to an occupied equipment room, coordinated with the building's existing fire systems.
Yes. Every cable is labelled at both ends to a documented schedule, tested, and recorded in a patching record you keep. This is the single highest-value part of a rebuild.
Talk to us
Describe the process that is costing you time or money. We will tell you honestly whether software is the right answer, and what it would take.